Pilar Gold & Silver Project.

Projects.

Region Suaqui Grande - Sonora, Mexico
Location Western edge of the Sierra Madre Occidental
Metals Au, Ag
Ownership 49%, in JV with TOCVAN Ventures (51%)
NSR 0% (None)
Size 105 Hectares
Stage Advanced Exploration
Drilling More than 23,000 meters of drilling (RC & Core)
Type of Mineralization Epithermal Vein/ Breccia System
Active Artisanal Mining Yes, outside of concessions

Bulk Sample Summary.

Drilling Highlights.

Maps & Photo Gallery.

  • Completed in 2023
  • 700 tonnes of material were crushed and processed through heap leach
  • Avg Head Grade of 1.9 g/t Au and 7 g/t Ag
  • Bulk Heap Leach Results of coarse fraction, 62% recovery of Au and 47% recovery of Ag
  • Agitated Leach Results, 80% recovery of Au and 94% recovery of Ag after just 24-hours of retention time
  • Initial Gravity and Agitated Leach tests returned over 95% recovery of Au, over 73% recovery of Ag

Pilar Gold & Silver Project Summary.

  • A large pile of dirt in the middle of a desert with mountains in the background.

    Slide title

    Write your caption here
    Button
  • A drawing of a mountain with the words at surface low cost gold & silver open at depth and along strike

    Slide title

    Write your caption here
    Button
  • A drawing of a cross section of a mountain with the numbers t21.3 on it

    Slide title

    Write your caption here
    Button
  • A cross section of a gold mine shows a concentration of 0.8 g / l au

    Slide title

    Write your caption here
    Button
  • 2024 Phase IV RC Drilling Highlights - Presently Underway (all lengths are drilled thickness)
  • 56.4m @ 1.0 g/t Au
  • 42.7 @ 0.96 g/t Au


  • 2022 Phase III Diamond Drilling Highlights include (all lengths are drilled thicknesses):
  • 116.9m @ 1.2 g/t Au, including 10.2m @ 12 g/t Au and 23 g/t Ag
  • 108.9m @ 0.8 g/t Au, including 9.4m @ 7.6 g/t Au and 5 g/t Ag
  • 63.4m @ 0.6 g/t Au and 11 g/t Ag, including 29.9m @ 0.9 g/t Au and 18 g/t Ag


  • 2021 Phase II RC Drilling Highlights include (all lengths are drilled thicknesses):
  • 39.7m @ 1.0 g/t Au, including 1.5m @ 14.6 g/t Au
  • 47.7m @ 0.7 g/t Au including 3m @ 5.6 g/t Au and 22 g/t Ag
  • 29m @ 0.7 g/t Au
  • 35.1m @ 0.7 g/t Au


  • 2020 Phase I RC Drilling Highlights include (all lengths are drilled thicknesses):
  • 94.6m @ 1.6 g/t Au, including 9.2m @ 10.8 g/t Au and 38 g/t Ag;
  • 41.2m @ 1.1 g/t Au, including 3.1m @ 6.0 g/t Au and 12 g/t Ag ;
  • 24.4m @ 2.5 g/t Au and 73 g/t Ag, including 1.5m @ 33.4 g/t Au and 1,090 g/t Ag


  • 15,000m of Historic Core & RC drilling. Highlights include:
  • 61.0m @ 0.8 g/t Au
  • 21.0m @ 38.3 g/t Au and 38 g/t Ag
  • 13.0m @ 9.6 g/t Au
  • 9.0m @ 10.2 g/t Au and 46 g/t Ag

Qualified Person

Brodie A. Sutherland, CEO for Tocvan Ventures Corp. and a qualified person ("QP") as defined by Canadian National Instrument 43-101, has reviewed and approved the technical information.

Stay Updated With Colibri.

Sign up for our newsletter to receive news releases and exclusive company updates.

Share by: