- Location: In the Caborca Orogenic Gold Belt
- A regionally significant & active gold mining district
- Numerous historic adits on property
- Historical & current artisanal placer mining activity on property
- Size: 4260 hectares (2 claims)
- Targeting: >1 million ounce of gold – open pit resource
- Ownership: 100% owned
- Work Completed:
- 1 drill program – 1570m in 10 holes (2008) – highlight included 11.65m @ 0.66 g/t Au
- 1853 grab & chip samples – including 15 samples >10 g/t Au, 132 samples > 1.0 g/t Au, and 524 samples >0.10 g/t Au
- 9 Target Areas identified to date
- 3D Induced Polarization Study (14.1 line kilometres)
- Stream sediment study
Plomo Gold Project
Summary
Location & Infrastructure
- Near a major highway (HWY #2)
- Infrastructure and support services are available in city of Caborca (pop. 60,000) – 60km SE of Evelyn
- Accommodation, electricity, internet/phone services available in Caborca
- Qualified & experienced local workforce
- Water is available nearby
- Accessible year round by maintained ranch roads
Regional Claims Map
Next Steps
- Prioritization of drill targets
- Development of drill targets from existing prospects
- Property wide evaluation