- Location: Sierra Madre - Yecora Area, Sonora
- Size: 1113 Hectares (11.13 Km²)
- Stage: Grass Roots Exploration - "New Discovery" (samples as high as 9.65 g/t gold and 515 g/t silver)
- Claims border Minera Alamos’ Santana Project
- Santana hosts a series of andesite breccia deposits
- The Nicho deposit is currently under mine development and is anticipated to declare commercial production in 2023. The Jackie eastern border is 6.5km NW from Nicho deposit
- The project has not been systematically explored fully
- A series of targets for follow up have been identified from Lidar, ASTER and satellite photography
- 50% Joint Venture with Silver Spruce Resources
Jackie Gold & Silver Project
Summary
Proximity to Minera Alamos - Nicho Deposit
(Under Development - commercial production to be declared in 2023)
- Near major highway
- 1116 Hectares (11.16 Km²)
- 2 km from the town of Tepoca, Sonora
Divisadero Zone (2018 & 2019 drilling discovery)
- 95.7 m @ 0.85 g/t Au, 9.8 g/t Ag , 96.4 m @ 0.42 g/t Au, 3.6 g/t Ag, 133.6 m @ 0.56 g/t Au, 6.5 g/t Ag
Nicho Zone (Phase 2 Development)
- Mineralized from surface to depths of over 250m
- 2018 drilling highlights include: 127.0m @ 0.81 g/t Au, 80.4m @ 1.05 g/t Au, 247.9m @ 0.60 g/t Au
Nicho Norte Zone (bulk test mining completed)
- Past drilling highlights include: 93.0m @ 1.03 g/t Au, 74.7m @ 0.78 g/t Au